1. Cold drawing process line of adequate capacity to manufacture cold deformed hexagonal bar.
2. Suitable end finishing machine for carrying out cutting of cold deformed hexagonal bar to required length by cold machining.
3. Turning / thread rolling / thread forming machine.
Hot Rolling.
Isothermal heat treatment line to achieve required mechanical properties as specified.
Shot Blasting
Facility of Zinc coating and Chromate passivation.
Facility for removal of Hydrogen Embrittlement.
Crack detection testing facility.
Bend removing (straightening) machine.
Bend test facility.
Mechanical, metallurgical and Chemical analysis testing facilities to test the required parameters as specified in specification no.OFM/TDS/TRACK-72/02.
NUT TO DRG.NO.613.44.071,TECHNICAL REQUIREMENT AS PER SPEC. NO.OFM/TDS/TRACK-72/O3
Drawing no.
DRG.NO.613.44.071
Manufacturing Technology
1. Cold drawing process line of adequate capacity to manufacture cold deformed hexagonal bar.2. Suitable end finishing machine for sizing of cold deformed hexagonal bar to required length by cold machining.
Hot Rolling. Suitable heat treatment line to achieve required mechanical properties as specified.
Facility of Zinc coating and Chromate passivation.
Testing / Inspection Facility
Crack detection testing facility.
Mechanical, metallurgical and Chemical analysis testing facilities to test the required parameters as specified in specification no.OFM/TDS/TRACK-72/03.
RUBBERISING OF SHORT BUSHING TO DRg.No.613.44.061, AS PER SPEC.No.OFM/TDS/TRACK-72/04 AND COMPLETE ASSEMBLY DRg.No.613.44.057 Cb.
Drawing no.
DRg.No.613.44.061,
Manufacturing Technology
1. Injection moulding machine.
Testing / Inspection Facility
1. Tensile strength testing facility.
2. Hardness testing facility.
3. Brittleness testing facility at low temperature.
4. Bonding strength test facility.
5. Service life (Endurance) test facilities.
6. Testing facilities as per specification no. OFM/TDS/TRACK-72/04.
1. Tensile strength testing facility.
2. Hardness testing facility.
3. Brittleness testing facility at low temperature.
4. Bonding strength test facility.
5. Service life (Endurance) test facilities.
6. Testing facilities as per specification no. OFM/TDS/TRACK-72/04.
RUBBERISING OF LONG BUSHING TO DRg.No.613.44.059,AS PER SPEC.No.OFM/TDS/TRACK-72/04 AND COMPLETE ASSEMBLY DRg.No.613.44.055 Cb.
Drawing no.
DRg.No.613.44.059
Manufacturing Technology
1. Injection moulding machine.
Testing / Inspection Facility
1. Tensile strength testing facility.
2. Hardness testing facility.
3. Brittleness testing facility at low temperature.
4. Bonding strength test facility.
5. Service life (Endurance) test facilities.
6. Testing facilities as per specification no. OFM/TDS/TRACK-72/04.
SHORT BUSHING TO DRG. NO.613.44.061, TECHNICAL REQUIREMENTS AS PER SPEC. NO. OFM/TDS/TRACK-72/01.
Drawing no.
Manufacturing Technology
DRG. NO.613.44.061
1. Cold drawing process line of adequate capacity to manufacture cold deformed pipe with inner hexagonal profile.2. Heat treatment line to achieve required mechanical properties as specified.3. Suitable end finishing machine for carrying out cutting of cold deformed pipe with inner hexagonal profile to required length by cold machining.
Hot Rolling.
Testing / Inspection Facility
Mechanical, metallurgical, chemical analysis and crack detection testing facilities to test the required parameters as specified in specification no. OFM/TDS/TRACK-72/01.
MEDIUM BUSHING TO DRG. NO.613.44.060, TECHNICAL REQUIREMENTS AS PER SPEC. NO. OFM/TDS/TRACK-72/01.
Drawing no.
DRG. NO.613.44.060
Manufacturing Technology
1. Cold drawing process line of adequate capacity to manufacture cold deformed pipe with inner hexagonal profile.2. Heat treatment line to achieve required mechanical properties as specified. 3. Suitable end finishing machine for carrying out cutting of cold deformed pipe with inner hexagonal profile to required length by cold machining.
Hot Rolling.
Testing / Inspection Facility
Mechanical, metallurgical, chemical analysis and crack detection testing facilities to test the required parameters as specified in specification no. OFM/TDS/TRACK-72/01.
1. Cold drawing process line of adequate capacity to manufacture cold deformed pipe with inner hexagonal profile. 2. Heat treatment line to achieve required mechanical properties as specified. 3. Suitable end finishing machine for carrying out cutting of cold deformed pipe with inner hexagonal profile to required length by cold machining
Mechanical, metallurgical, chemical analysis and crack detection testing facilities to test the required parameters as specified in specification no. OFM/TDS/TRACK-72/01.
62
194
Number
2162
EOI/PROVISIONAL/REGULARIZATION
Ordnance Equipment Factory
The General Manager,
Kanpur
Kanpur
Kanpur, Uttar Pradesh
208001
Supply Installation and Commissioning of Pneumatic Assembly Drg No VMT SK 119 18000 11 with Festo Make Control Cabinet Part No. IN CS 3049329 for 125 mm SCCC Winding Machine as per Part List Sheet No 1 to 8 and 10 and 11 Drawing and Scope of Work attached
Specification
Supply Installation and Commissioning of Pneumatic Assembly Drg No VMT SK 119 18000 11 with Festo Make Control Cabinet Part No. IN CS 3049329 for 125 mm SCCC Winding Machine as per Part List Sheet No 1 to 8 and 10 and 11 Drawing and Scope of Work attached
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject items. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject items. Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
1. NABL Test for ebonite Type-I unloaded as per Specification IS 6693:83 with Tensile & Impact test
2. NABL test for Copper as per specification IS 3487:94
3. NABL test for Pine rosin & Varnish as per Specification mentioned in Drawing
4. Multimeter to Test resistance
5. Tin Coating Thickness
6. General Purpose Engineering Equipment’s for measuring dimension like Vernier Caliper / Micrometer , Depth gauge etc.
SUPPLY OF SCREW PISTOL GRIP TO D.S. CAT. NO. 5305-005004 (ICR - 1380) TO LATEST D.C No.24275-SA DATED 26.02.1999 FOR DC.NO. LATEST ISSUE TO BE FOLLOWED
Specification
AS PER D.S. CAT. NO. 5305-005004 (ICR - 1380) TO LATEST D.C No.24275-SA DATED 26.02.1999 FOR DC.NO. LATEST ISSUE TO BE FOLLOWED
SUPPLY OF PIN AXIS HAMMER TO DS. CAT NO. 5315-009115 DC NO.25060-SA DT. 05/07/2001 REQUIRED IN WHITE FINISHED CONDITION . FOR DC NO. LATTEST ISSUE TO BE FOLLOWED. (WITH FIRMS MATER
Specification
AS PER DS. CAT NO. 5315-009115 DC NO.25060-SA DT. 05/07/2001 REQUIRED IN WHITE FINISHED CONDITION
Drawing no.
DS. CAT NO. 5315-009115 DC NO.25060-SA DT. 05/07/2001 REQUIRED IN WHITE FINISHED CONDITION
GUARD HAND LEFT & RIGHT ASSY. (PLASTIC) No.2, CQA(SA)/91,D.S.CAT.No.1005-007723,D.C.No.22706-SA Dt.5-11-94 IMPROVED VERSION FOR RIFLE 7.62mm 1A1 TO D.S.CAT.No.: 1005-007504, 1005-007505, 1005-007506,1005-007507,1005-001593,1005-1718,
Specification
AS PER DRG No.2, CQA(SA)/91,D.S.CAT.No.1005-007723,D.C.No.22706-SA Dt.5-11-94 IMPROVED VERSION FOR RIFLE 7.62mm 1A1 TO D.S.CAT.No.: 1005-007504, 1005-007505, 1005-007506,1005-007507,1005-001593,1005-1718,
DRG No.2, CQA(SA)/91,D.S.CAT.No.1005-007723,D.C.No.22706-SA Dt.5-11-94 IMPROVED VERSION FOR RIFLE 7.62mm 1A1 TO D.S.CAT.No.: 1005-007504, 1005-007505, 1005-007506,1005-007507,1005-001593,1005-1718,
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject items. . Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
Firm must submit the details of Manufacturing Technologies and Inspection/Testing Facilities available with the firm for manufacturing the subject items. . Quality assurance plan (IF ANY) related to production and inspection to be submitted in technical bid. List of Plant & Machineries required for manufacturing of subject item to be submitted.
30
1
Set
2170
TE NO 190401P2FO
Gun Carriage Factory
The General Manager,
Jabalpur
Jabalpur
Jabalpur,Madhya Pradesh
482011
a) Raw material foam test from NABL Lab as per specification IND/ME 913 (a) Prov 2004.
b) General Purpose engineering equipment's like Vernier, Scale, Tape etc. to measure dimensions.
a) Raw material test from NABL Lab as per JSS 9330-03 (Latest issue)
b) General Purpose engineering equipment’s to measure dimensions
c) Mechanical test like jolt test, drop test.
d) Relevant test as per specification CQA(A) 2804.
ST SQR.75 MM TO SPECN.BS:3S144:1995(1999)GD S144H
LFVD WITH CAL.SILICIDE TREATMENT.INCLUSION RATINGCHART
SECONDARY REFINING STEEL AS PER SPECN.IS:4163-82,i.e.THN/THK
SULPHIDE:1.5-1,ALUMINA:1.5-1,SILICATE:1.5-1,GLOBULAR OXIDE:
2.0-1.
Specification
ST SQR.75 MM TO SPECN.BS:3S144:1995(1999)GD S144H
LFVD WITH CAL.SILICIDE TREATMENT.INCLUSION RATINGCHART
SECONDARY REFINING STEEL AS PER SPECN.IS:4163-82,i.e.THN/THK
SULPHIDE:1.5-1,ALUMINA:1.5-1,SILICATE:1.5-1,GLOBULAR OXIDE:
2.0-1.